Progress continues on the remodeling of the building that will house the Agatelady Rock Shop, which is scheduled to open on June 1, 2023 in Grand Marais, MI.
The interior walls are almost installed....
The walls are in!
I primed the wood showing on the exterior. The white panel to the left of the ladder is the location of the original door. Because snow and rain always fell on your head when you entered that door, I had a new door installed on the north side of the building, which faces the new parking lot.
I only bought one gallon of primer to start and ran out just before I was done.
Finished the priming.
Now I have to decide what color top coat and trim I will use. Some options that have been suggested so far are: match colors on my house (which is next to the rock shop building), duplicate the colors on the current Gitche Gumee Museum, or go wild and use a bright, color-attention color.
Yesterday, my contractor put in half the ceiling insulation.